Litres, labour and duration with the detail a professional expects. No sign-up.
Indicative prices for the UK in 2026, excluding tax. Replace them with your area's or your company's: the estimate updates.
How we calculate: Walls = estimated perimeter × height × 1.15 (partitions) minus openings (4.5 m² per room). Litres = m² × coats ÷ coverage. Patching on 30% of the area; re-skim on all of it if the walls are poor. Duration at 90 m² per coat per day. An indicative estimate, not a firm quote. Prices vary by area, the condition of the home, access and the contractor.
No sign-up. Published with Teddy.